background image

9

18

Installing an Internal Ground 

Cable

3.1

Installing Internal DC 

Terminals

3.2

Connect the ground 

points of modules in 

sequence, and secure 

the ground cable using 

a ground screw.

Connect cables in accordance with local installation laws and regulations.

Before connecting cables, ensure that the DC switch on the battery and all the switches 

connected to the battery are set to OFF. Otherwise, the high voltage of the battery may result 

in electric shocks.

3

Internal Electrical Connections of the Battery

Internal electrical cables are delivered with the battery, see the 

Packing List in the packing case.

The Amphenol terminal is used as the DC terminal between the power control module and the 

battery expansion modules.

Summary of Contents for LUNA2000-5-30-NHS0

Page 1: ...HUAWEI TECHNOLOGIES CO LTD LUNA2000 5 30 NHS0 Quick Guide Issue 03 Part Number 31500EMB Date 2021 05 30 ...

Page 2: ... module is 5 kW and a battery expansion module has a standard capacity of 5 kWh 1 Power control module DCDC 2 Black start switch 3 Battery terminals BAT BAT 4 COM port COM 5 Battery cascading terminals B B 6 DC switch DC SWITCH 7 COM port COM 8 Fuse 9 Ground point 10 Battery terminals BAT BAT Front view Left view Right view Copyright Huawei Technologies Co Ltd 2021 All rights reserved The LUNA2000...

Page 3: ...battery expansion modules 1 Battery expansion module 2 Boss for alignment 3 Battery cascading terminals B B 4 Battery cascading terminals B B 5 COM port COM 6 Ground point 7 Heat sink 8 Ground point Front view Left view Right view Signal cable DC input cable 5 kWh 10 kWh 15 kWh 20 kWh 25 kWh 30 kWh A maximum of three battery expansion modules are supported for the JET S JET certification ...

Page 4: ...irements 2 1 Installation Environment Installation Space INVERTER Do not use a dropped battery module or a battery module that has been subjected to a strong impact force Otherwise safety risks such as cell leakage and electric shock may arise ...

Page 5: ...ing Hole Dimensions First Battery PACK DCDC one PACK used DCDC two PACKs used Second Battery PACK Third Battery PACK DCDC three PACKs used The M6x60 expansion bolts delivered with the battery are mainly used for solid concrete walls and concrete floors If other types of walls and floors are used ensure that the walls and floors meet the load bearing requirements one battery expansion module weighs...

Page 6: ...the wall surface Align the marking off template with the upper surface of the floor support Ground Level Mounting holes for the 15 kWh module Mounting holes for the 10 kWh module Mounting holes for the 5 kWh module Wall Baseboard Marking line Pack mounting holes ...

Page 7: ...l and two battery expansion modules are installed for a 10 kWh model 1 Install the battery expansion modules and power control module on the support Align the first battery expansion module with the support on the floor support Install the connecting pieces on both sides and tighten the four screws Install the remaining battery modules and power module from bottom to top After installing a module ...

Page 8: ...g Hole Dimensions You can adjust the connecting piece vertically to align with the screw holes 3 Secure the battery expansion modules to the wall by referring to step 2 First Battery PACK DCDC one PACK used DCDC two PACKs used Second Battery PACK Third Battery PACK DCDC three PACKs used ...

Page 9: ... mm high If waterproofing requirements cannot be met the battery can be installed on a wall The mounting kits need to be purchased separately For wall and floor mounted installation ensure that the load bearing capacity meets the requirements one battery expansion module weighs 50 kg Installing the Support for Wall mounted Installation Mounting holes for support Pack mounting holes ...

Page 10: ...fore connecting cables ensure that the DC switch on the battery and all the switches connected to the battery are set to OFF Otherwise the high voltage of the battery may result in electric shocks 3 Internal Electrical Connections of the Battery Internal electrical cables are delivered with the battery see the Packing List in the packing case The Amphenol terminal is used as the DC terminal betwee...

Page 11: ...ameter of 5 mm into a Ф7 mm rubber plug the 7 mm hole is used to connect to an inverter or cascaded battery After inserting the terminal shell into the COM port shake the terminal shell left and right and pull it back to ensure that it is securely installed and tighten the nut ensure that the rubber plug is tightly compressed Otherwise the waterproof performance is affected Click Install the inter...

Page 12: ...le Hole 4 2 Before connecting external cables route the cables through the cable hole to avoid disconnecting after installation Prepare cables based on site requirements Ground a ground point of the power control module Apply silica gel or paint around the ground terminal after the ground cable is connected Power control module Before connecting cables ensure that the DC switch on the battery and ...

Page 13: ...ated insulated tools to connect cables Ensure that battery cables are connected to correct polarities If the battery cables are reversely connected the battery may be damaged 1 You are advised to connect the battery terminals BAT and BAT on the switch side to the inverter and connect the other side to the cascaded battery 2 The battery terminals use the Staubli MC4 positive and negative metal term...

Page 14: ...en the locking cap If multiple signal cables need to be connected ensure that the outer diameters of the signal cables are the same Installing a Signal Cable 4 5 Communications Terminal Description It is recommended that the right side of COM port be connected to the inverter and the left side of the COM port be connected to the cascaded batteries The communications terminal insertion directions o...

Page 15: ...485 differential signal Reserved 7 485B1 RS485B RS485 differential signal Connects to the RS485 signal port of the inverter or cascaded batteries 8 CANL Extended CAN bus port Used for signal cable cascading in battery cascading scenarios 9 CANH Extended CAN bus port Used for signal cable cascading in battery cascading scenarios 10 PE Ground point on the shield layer Ground point on the shield laye...

Page 16: ...Networking 1 Communications terminal for cascaded batteries 2 Communications terminal connected to the inverter Optional Cable Connections in Cascading Scenarios 4 6 Insert the terminals according to the silkscreen number Pins 6 to 10 are close to the groove side Click ...

Page 17: ... be purchased Insert the terminals according to the silkscreen number Pins 6 to 10 are close to the groove side 4 7 Connecting Cables to the Inverter Click When a communications terminal is connected to a single network cable a waterproof rubber plug must be installed After inserting the terminal shell into the COM port shake the terminal shell left and right and pull it back to ensure that it is ...

Page 18: ...17 1 Self supporting output 2 Grid tied output Master power distribution panel Specific load power distribution panel ...

Page 19: ...l of the battery 2 OUT 12V_OUT Enable 3 A1 RS485A1 Used for connecting to the RS485 signal ports of the battery 4 B1 RS485B1 5 Verifying the Installation After electrical connections are complete check that cables are correctly and securely connected install the external protective cover and secure it using screws Installing the Cover 5 1 ...

Page 20: ...xceed 24 hours Otherwise condensation may cause damage to the device After turning on the battery switch power on the inverter For details about how to power on the inverter see the quick guide for the corresponding inverter model If no PV module is configured press the black start button Turn on the DC switch on the battery After the battery is installed and powered on for the first time the ring...

Page 21: ...loyment upgrade the SmartLogger After the upgrade reconnect the SmartLogger and set battery parameters Upgrading the SmartLogger 7 1 7 Device Commissioning 1 If the device is not connected to the FusioSolar management system you are advised to use a USB flash drive for upgrade You can insert the USB flash drive with the upgrade package and go to the device upgrade screen to start the upgrade Devic...

Page 22: ...t or owner skip this step if an account exists You can obtain the FusionSolar App Quick Guide by scanning the QR code Method 1 Search for FusionSolar on Huawei AppGallery and download the latest installation package Method 2 Access https solar huawei com using the mobile phone browser and download the latest installation package FusionSolar Method 3 Scan the following QR code and download the late...

Page 23: ...o the SmartLogger as user installer Quick SmartLogger configuration is not supported when the language of your phone is set to English You need to set the language to Japanese For details see the Japanese quick guide 7 2 3 Battery Status Check After the battery is added tap Device monitoring on the home screen and choose Maintenance Subdevice management to view the running status level power and c...

Page 24: ...ner Then on the home screen choose Maintenance Upgrade device to upgrade the battery version 4 95KTL JPL1 COM1 12 4 95KTL JPL1 COM1 13 Storage and Recharging Fuse Replacement If a fuse needs to be replaced replace it by referring to the user manual The batteries need to be recharged for a certain period of storage For details see the user manual ...

Page 25: ...68 0 1 When the IP address of the WAN port is on the 192 168 8 1 192 168 8 255 network segment the IP address of the LAN port is automatically switched to 192 168 3 10 and the default gateway is 192 168 3 1 If the connection port is a LAN port adjust the network configuration of the PC accordingly 3 Set LAN parameters If the SmartLogger is connected to a local area network LAN and a proxy server h...

Page 26: ...user is liable for any loss caused to the PV plant If you enter wrong passwords for five consecutive times within 5 minutes your account will be locked out Try again 10 minutes later Commissioning Through Deployment Wizard 1 Enter https XX XX XX XX in the address box of the browser XX XX XX XX is the default IP address of the SmartLogger If you log in to the WebUI for the first time a security ris...

Page 27: ...ind express or implied 2 Before installing the device read the user manual carefully to get familiar with product information and safety precautions 4 Before installing the device check that the package contents are intact and complete against the packing list If any damage is found or any component is missing contact your dealer 5 The device damage caused by the violation of instructions in this ...

Page 28: ...Huawei Technologies Co Ltd Huawei Industrial Base Bantian Longgang Shenzhen 518129 People s Republic of China solar huawei com ...

Reviews: