Step 4
Install the rear panel of the NetCol5000-C enclosure frame in the same way described in
----End
2.4 Combining Cabinets
This section describes how to combine server cabinets, NetCol5000-Cs, half-size PDU8000s,
and air conditioners.
For details about how to combine the Liebert APM UPS cabinets, see
2.4.1 Combining Server Cabinets
Context
This section describes how to combine server cabinets, UPS5000-As, and NetCol5000-As.
Procedure
Step 1
Level and combine the cabinets.
Figure 2-20
Leveling and combining two adjacent cabinets
1.
Open the front and rear cabinet doors. Wrench the anchor bolts using an adjustable
wrench to adjust the cabinet height, as shown in 1 in
. Use a measuring tape
to measure the cabinet heights at different corners to ensure that the cabinet is level.