IDS1000-A Air-Cooled Container Data Center
All-in-One Maintenance Guide
3 Maintenance
Issue 01 (2016-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
30
3.3.6 Other Systems
Table 3-13
Quarterly maintenance checklist for other systems
Item
Method
Expected
Result
Troubleshooting
Containers
Check the
container.
The container
is clean.
1.
Clean the container using a
long-handled soft brush and
alkaline or neutral detergent.
2.
Wash the container with clean
water.
The container
is free from
rust.
For details, see the
Paint Repair
section in the installation guide.
3.4 Semi-annual Maintenance
3.4.1 Power Supply and Distribution System
Table 3-14
Semi-annual maintenance checklist for the power supply and distribution system
Item
Method
Expected
Result
Troubleshooting
PDC
Check the circuit
breakers.
The circuit
breaker labels
are legible and
intact.
Reprint the labels.
UPS
Check the UPS
circuit breakers.
The circuit
breaker labels
are legible and
intact.
Reprint the labels.
ATS
Check the ATS
controller display
panel.
The panel
indicator is on.
1.
If the panel indicator is off,
verify that the power cable is
properly connected.
2.
Replace the ATS by following
instructions in documents
delivered with the ATS.
The controller
display panel
displays
information
properly.
1.
If the information is not properly
displayed (fuzzy or blank),
verify that the power cable is
properly connected.
2.
Replace the ATS by following
instructions in documents
delivered with the ATS.