Figure 3-7
Removing a filler panel
3.
Place the removed filler panel in an accessory recycle bin.
Step 3
Install the compute node.
To prevent device damage or personal injury, hold the bottom of the device with both hands
when installing it.
1.
Install a partition board.
NOTE
Install a partition board between two half-width compute nodes. Perform this operation only when
no partition board is installed between two half-width compute nodes.
a.
Tilt the partition board to the chassis, insert it into the installation holes, and make it
upright. See (1) and (2) in
.
b.
Pull the partition board outwards. See (3) and (4) in
.
The partition board is properly installed when you hear a click.
FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
3 Basic Operations
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
15