
Figure 3-8
Installing a partition board
2.
Press the ejector release button on the compute node. See (1) in
.
3.
Fully open the ejector lever. See (2) in
4.
Slide the compute node into the chassis horizontally. See (3) in
.
5.
Close the ejector lever. See (4) in
.
Figure 3-9
Installing a compute node
Step 4
Power on the compute node.
Step 5
Check indicator status.
----End
FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
3 Basic Operations
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
16