
FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
8 Shutting Down and Powering Off
Issue 02 (2017-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
66
8
Shutting Down and Powering Off
Prerequisites
You have been permitted to power off the FusionModule1000.
Preparations
Tools: portable light
Document: power supply and distribution system diagram
Skill requirement: power distribution system engineer
For the diagrams, see the initial configuration parameter manual for the solution in use.
Procedure
Step 1
Shut down servers and storage devices.
Save parameters before power-off.
Power off the devices in the normal power-off logic sequence.
Step 2
Shut down the RH2288 server and VCN500.
Step 3
Shut down air conditioners.
Step 4
Switch off circuit breakers level by level to power off devices by referring to the power
supply and distribution system diagram.
During the power-off process, there is no fire or other exception, but the fire control panel displays a
power failure alarm. Ignore the alarm.
Step 5
Switch off the external power input circuit breaker of the FusionModule1000.