FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
4 Preparations for Power-On Commissioning
Issue 02 (2017-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7
Technical Manual
Function
Obtaining Method
(Remarks)
UPS5000-E-(40 kVA-320
kVA) User Manual
Describes how to
commission the
UPS5000-E.
UPS5000-E-(20 kVA-160
kVA) User Manual (Low
Voltage)
Describes how to
commission the
UPS5000-E.
FusionModule1000B
V100R003C00 Outsourced
Component Document
Package
Describes how to power on
and commission each
component.
Downloaded from
the link is not available,
contact onsite Huawei
engineers.
4.3 Commissioning Personnel Skill Requirements
describes the skill requirements for the FusionModule1000 commissioning
personnel.
Table 4-3
Skill requirements for the FusionModule1000 commissioning personnel
Field
Personnel Skill Requirement
Power supply and
distribution system
Familiar with the power supply and distribution system
configurations and the operations for each core component in the
FusionModule1000
With power distribution engineer qualifications
Cooling system
Familiar with the cooling system configurations and the operations
for each core component in the FusionModule1000
With cooling engineer qualifications
Management
system
With knowledge in the hardware and software of the container data
center, familiar with basic communications protocols, familiar with
equipment interfaces in extra low voltage (ELV) systems, and
proficient in operating the NetEco management system
With ELV engineer qualifications
Fire extinguishing
system
Familiar with the fire extinguishing system configurations and the
operations for each core component in the FusionModule1000
With fire protection engineer qualifications
Lighting and
structural systems
Familiar with the overall configurations and layout of the
FusionModule1000
Experienced in data center maintenance