FusionModule1000B Water-Cooled IT Solution
Commissioning Guide
4 Preparations for Power-On Commissioning
Issue 02 (2017-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4
4
Preparations for Power-On
Commissioning
4.1 Tool Preparations
lists the tools required for power-on commissioning.
Table 4-1
Tools
Tools
Phillips screwdriver
Flat-head screwdriver
Utility knife
Multimeter
Electroprobe
Network cable tester
Cable tie
Insulation tape
Marker