32
Step 7
Ensure that all optical fibers are in the trough
and close the shell. If an optical fiber is routed
from the outer side of the 86-type junction box,
knock off the knock-down hole on the lower left
side of the shell.
Knock-down
hole
Before installing the shell, ensure that the optical fibers are
well coiled without tilting to prevent the optical fibers from
being pressed by the shell.