Table 6-2
Mapping between the cross-sectional area of the conductor and the value of L1
Cross-
Sectional
Area of
Conductor
(mm
2
(in.
2
))
Value of L1
(mm(in.))
Cross-Sectional
Area of Conductor
(mm
2
(in.
2
))
Value of L1
(mm(in.))
1 (0.002)
7 (0.28)
10 (0.015)
11 (0.43)
1.5 (0.002)
7 (0.28)
16 (0.025)
13 (0.51)
2.5 (0.004)
7 (0.28)
25 (0.039)
14 (0.55)
4 (0.006)
8 (0.31)
35 (0.054)
16 (0.63)
6 (0.009)
9 (0.35)
50 (0.077)
16 (0.63)
NOTE
If you are proficient in assembling OT terminals and power cables, you can obtain the value of L1 by
comparing the part to be crimped with the power cable.
Step 2
Put the heat-shrinkable (A) tubing onto the bare crimping terminal, as shown in
.
Figure 6-24
Putting the heat shrink tubing onto the bare crimping terminal
Step 3
Put the OT terminal B onto the exposed conductor, and ensure that the OT terminal is in good
contact with the insulation coating C, as shown in
.
After the conductor is fed into the OT terminal, the protruding part of the conductor, or L2 in
, must not be longer than 2 mm (0.08 in.).
Step 4
Crimp the joint parts of the bare crimping terminal and the conductor, as shown in
.
AP8082DN and AP8182DN
Hardware Installation and Maintenance Guide
6 Appendix
Issue 03 (2019-04-01)
Copyright © Huawei Technologies Co., Ltd.
64