17. Decommissioning
Before carrying out this procedure, it is essential that the technician is completely familiar
with the equipment and all its detail. It is recommended good practice that all refrigerants
are recovered safely. Prior to the task being carried out, an oil and refrigerant sample shall
be taken.
In case analysis is required prior to re-use of reclaimed refrigerant. It is essential that
electrical power is available before the task is commenced.
a) Become familiar with the equipment and its operation.
b) Isolate system electrically
c) Before attempting the procedure ensure that:
mechanical handling equipment is available, if required, for handling refrigerant cylinders;
all personal protetive equipment is available and being used correctly;
the recovery process is supervised at all times by a competent person;
recovery equipment and cylinders conform to the appropriate standards.
d) Pump down refrigerant system, if possible.
e) If a vacuum is not possible, make a manifold so that refrigerant can be removed from
various parts of the system.
f) Make sure that cylinder is situated on the scales before recovery takes place.
g) Start the recovery machine and operate in accordance with manufacturer s instructions.
h) Do not overfill cylinders. (No more than 80% volume liquid charge).
i) Do not exceed the maximum working pressure of the cylinder, even temporarily.
j) When the cylinders have been filled correctly and the process completed, make sure that
the cylinders and the equipment are removed from site promptly and all isolation valves
on the equipment are closed off.
k) Recovered refrigerant shall not be charged into another refrigeration system unless it has
been cleaned and checked.
16. Charging procedures
In addition to conventional charging procedures, the following requirements shall be followed:
Ensure that contamination of different refrigerants does not occur when using charging
equipment. Hoses or lines shall be as short as possible to minimize the amount of
refrigerant contained in them.
Cylinders shall be kept upright.
Ensure that the refrigeration system is earthed prior to charging the system with refrigerant.
Label the system when charging is complete(if not already).
Extreme care shall be taken not to overfill the refrigeration system.
Prior to recharging the system it shall be pressure tested with OFN. The system shall be
leak tested on completion of charging but prior to commissioning. A follow up leak test
shall be carried out prior to leaving the site.
,
When the final OFN charge is used, the system shall be vented down to atmospheric pressure
to enable work to take place. This operation is absolutely vital if brazing operations on the
pipe-work are to take place.
Ensure that the outlet for the vacuum pump is not closed to any ignition sources and there
is ventilation available.
Summary of Contents for HTW-MO2-041IX41B2R32
Page 2: ......
Page 4: ......
Page 38: ......
Page 72: ......
Page 74: ......
Page 98: ......
Page 100: ......
Page 118: ..._ 1 _ f I l _ i 1 _ _ r MODELO 1X4 1010 5 kW 20...
Page 128: ...2...
Page 129: ...3...
Page 130: ...4...
Page 131: ...5...
Page 132: ...6...
Page 133: ...7...
Page 134: ...8...
Page 135: ...9...
Page 136: ...10...
Page 137: ...11...
Page 138: ...12...
Page 139: ...13...
Page 140: ...14...
Page 141: ...15...
Page 142: ...16...
Page 143: ...17...
Page 144: ...18...
Page 145: ...19...
Page 146: ...20...
Page 147: ...21...
Page 148: ...22...
Page 149: ...23...
Page 150: ...24...
Page 151: ...25...
Page 152: ...26...
Page 153: ...27...
Page 154: ...28...
Page 155: ...29...
Page 156: ...30...
Page 157: ...31...
Page 158: ...32...
Page 159: ...33...
Page 160: ...34...
Page 161: ...35...
Page 162: ...36...
Page 163: ...37...
Page 164: ...38...
Page 165: ...39...
Page 166: ...40...
Page 167: ...41...
Page 168: ...42...
Page 170: ......
Page 171: ......