![HTP ELP-110 Installation Start-Up Maintenance Parts Download Page 36](http://html.mh-extra.com/html/htp/elp-110/elp-110_installation-start-up-maintenance-parts_2179395036.webp)
36
LP-294 REV. 9.2.14
I. VERTICAL VENTING W/ TEE (INTAKE) AND COUPLING (EXHAUST)
Figure 15 – Vertical Venting - LP-293-F
NOTE:
Vent piping should be 12” over anticipated maximum snow level.
NOTE:
Drawing is meant to demonstrate system venting ONLY.
All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of ¼” per foot back to the boiler to allow
drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the boiler and the
balance at 4 foot intervals on the vent pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from the
boiler.
Summary of Contents for ELP-110
Page 48: ...48 LP 294 REV 9 2 14 Figure 27 Single or Cascade Master and Cascade Follower Controls ...
Page 49: ...49 LP 294 REV 9 2 14 Figure 28 ...
Page 76: ...76 LP 294 REV 9 2 14 Figure 32 ...
Page 77: ...77 LP 294 REV 9 2 14 Figure 33 LP 294 B ...
Page 80: ...80 LP 294 REV 9 2 14 ...
Page 81: ...81 LP 294 REV 9 2 14 ...