![HTP ELP-110 Installation Start-Up Maintenance Parts Download Page 13](http://html.mh-extra.com/html/htp/elp-110/elp-110_installation-start-up-maintenance-parts_2179395013.webp)
13
LP-294 REV. 9.2.14
C. CLEARANCES FOR SERVICE ACCESS
See Figure 3 for recommended service clearances. If these minimum clearances are not provided, it may not be possible to service the
boiler without removing it from the space.
Space must be provided with combustion/ventilation air openings correctly sized for all other appliances located in the same space as
the boiler. The boiler cover must be securely fastened to prevent it from drawing air from the boiler room. This is particularly important if
the boiler is in a room with other appliances. Failure to comply with the above could result in substantial property damage, severe
personal injury, or death.
MINIMUM CLEARANCES FROM COMBUSTIBLE MATERIALS
•
Hot water pipes – at least 1” from combustible materials.
•
Exhaust vent pipe – at least 1” from combustible materials.
Figure 3 – Specifications and Dimensions Drawing
MODEL*
A
B
C
D
E
F
G
H
J
K
L
SHIPPING WEIGHT
ELP-110
19
9
3
27.3
15
20
11.8
7.4
5.8
10
2.2
113
ELP-199
27
18
6
27.3
15
20
11.8
7.4
4.3
9
2.2
164
Table 1 – Dimensions and Weights
MODEL
BTU/INPUT
LOW – HIGH FIRE
DOE HEATING
IBR
SUPPLY / RETURN
EXHAUST / INTAKE
GAS CONNECTION
ELP-110
22,000-110,000
20,200-101,000
88,000
1"
3"
3/4"
ELP-199
44,000-199,000
40,600-203,000
177,000
1"
3"
3/4"
Table 2 - Specifications
Summary of Contents for ELP-110
Page 48: ...48 LP 294 REV 9 2 14 Figure 27 Single or Cascade Master and Cascade Follower Controls ...
Page 49: ...49 LP 294 REV 9 2 14 Figure 28 ...
Page 76: ...76 LP 294 REV 9 2 14 Figure 32 ...
Page 77: ...77 LP 294 REV 9 2 14 Figure 33 LP 294 B ...
Page 80: ...80 LP 294 REV 9 2 14 ...
Page 81: ...81 LP 294 REV 9 2 14 ...