1. This drawing is meant to show system piping concept only. The installer is responsible for all equipment and detailing by local codes. 

2. Antifreeze, non-potable HTF shall be used for the solar heat exchanger circuit only. Never introduce antifreeze solution to any connection 

other than the solar loop. 

3. If there is a check valve on the cold water feed line, a thermal expansion tank suitable for potable water must be sized and installed within 

this piping system between the check valve and cold water inlet of the solar water heater. 

4. An ASSE 1017 mixing valve is required per SRCC OG-300. 

5. A minimum of 12 diameters of straight pipe must be installed upstream of all circulators. 

6. Make sure tank is fully purged of air before power is turned on to the backup heat source. 

7. Circulators shown in the above hydronic piping should have an integral flow check or alternately use a stock pump with an external spring 

type check valve. (Due to extreme temperatures, circulators with integral flow checks are not to be used in solar systems. If circulator comes 

equipped with an integral flow check, remove it.) 

8. Non-vertical drain back solar system piping should pitch ¼” per foot to facilitate draining. 

9. No check valves are allowed within the solar loop. 

10. Solar pumps must be installed 3’ below the drain back tank. 

11. The drain back tank must be properly supported. 

12. The flow meter must be properly supported and installed no more than one (1) foot from the Versa Hydro.

 

STEP 4: PROGRAMMING THE SYSTEM 

NOTE:

 Programming the control is not possible when the unit is firing. Make sure any input (such as the thermostat) is turned off, so 

the water heater will remain idle to allow programming. 

 

SCREEN 

DESCRIPTION 

ENTER   MENU   CODE 

000 

To access the system setting program, press and hold the 

ENTER

 Key for 4 seconds, until the display 

shows the screen at left. 

 

ENTER   MENU   CODE 

925 

Using the arrow keys on the display, log in your 

System Menu Access Code “925”

. To confirm code, 

press 

ENTER

 to access system setting program navigation menu. 

Table 2 – System Settings 

Once the 

System Menu Access Code

 is confirmed, the user can set System Parameters. Use the arrow keys on the display to 

navigate through the different program settings. To change an appliance setting, press 

ENTER

. Increase system settings by pressing 

 and decrease by pressing 

 on the display. 

 

Listed below are the system settings that can be programmed into the control. 

 

Summary of Contents for 7100P-220

Page 1: ...lement for a list of tools and materials required in solar installations STEP 1 INSTALLATION OF THE SENSORS 1 Remove cover from tank sensor opening to expose the stud Tt Remove the existing clip and nut See Figure 1 2 Attach the tank sensor grey wire provided in this kit to the stud using the existing clip and nut See Figure 2 3 Use a drill with bit to drill a hole in the center of the tank sensor...

Page 2: ...eed the solar connector sensor wires through a knockout on the right side of the electronics cabinet 11 Connect the panel sensor wires to the SOLAR SENSOR terminals on the customer connection board NHX Models ONLY 1 Connect the NHX pump power leads to the NHX PUMP J3 terminals on the customer connection board See Figure 7 2 Connect the wires from the top sensor of the solar storage tank to the Ts ...

Page 3: ...nnect the flow meter wire from the customer connection board and install the flow meter as described in the included instruction sheet on the collector supply line pipe running from the Versa Hydro to the solar collector 5 After the flow meter is properly installed feed the flow meter wire through the knockout and reconnect to the customer connection board 6 See Figure 9 for an example of complete...

Page 4: ...e and cold water inlet of the appliance 3 Gas line must be rated to the maximum capacity of the unit Unit must have 10 feet of pipe after gas regulator 4 All circulators shall have an integral flow check 5 An ASSE 1017 mixing valve is required per SRCC OG 300 6 The flow meter must be properly supported and installed no more than one 1 foot from the Versa Hydro NOTE This drawing is meant to show sy...

Page 5: ...meters of straight pipe must be installed upstream of all circulators 6 Make sure tank is fully purged of air before power is turned on to the backup heat source 7 Circulators shown in the above hydronic piping should have an integral flow check or alternately use a stock pump with an external spring type check valve Due to extreme temperatures circulators with integral flow checks are not to be u...

Page 6: ...r inlet of the appliance 3 Gas line must be rated to the maximum capacity of the unit Unit must have 10 feet of pipe after gas regulator 4 All circulators shall have an integral flow check 5 An ASSE 1017 mixing valve is required per SRCC OG 300 6 The flow meter must be properly supported and installed no more than one 1 foot from the Versa Hydro NOTE This drawing is meant to show system piping con...

Page 7: ...low check remove it 8 Non vertical drain back solar system piping should pitch per foot to facilitate draining 9 No check valves are allowed within the solar loop 10 Solar pumps must be installed 3 below the drain back tank 11 The drain back tank must be properly supported 12 The flow meter must be properly supported and installed no more than one 1 foot from the Versa Hydro STEP 4 PROGRAMMING THE...

Page 8: ... Volts Range 1 to 10 Volts Table 3 Solar System Parameters STEP 5 SOLAR STATUS MENU The controller also has the ability to review solar system status To access solar status screens press twice Once the first value is displayed press the or keys to access additional information At any point you may press RESET to exit the solar status screens SCREEN DESCRIPTION 0 SOLAR SOLAR 0 FUEL This screen disp...