HyQuest Solutions Pty. Ltd.
Model AD375MA
© Copyright
Page 5
Issue 3 July, 2017
Beaded Float Line
•
Two adjustable end hooks (part EH01) are provided for attaching the beaded float line
to the float and the counterweight. The length of the float line should be such that the
counterweight will not run into the shelf or pulley when the float is at a low stage or
strike the bottom of the float well when the float is at the highest stage. Float and
counterweight should pass each other and should have adequate clearance from the
sides of the stilling well.
•
Beaded line should be cut about 1/16 inch past a bead to prevent fraying.
•
Attach the float line to the float and lower it to the water. Pass the float line over the
pulley making sure that the cable beads (or tape perforations) engage the respective
recessed (or spines) on the pulley. Attach the counterweight and lower it into position.
Borehole Float Line
•
Attach borehole guide pulleys to mounting bracket. Ensure guide sheave grooves line
up with float pulley groove.
•
Two adjustable end hooks (part EH01) are provided for attaching the float line to the
float and the counterweight. The length of the float line should be such that the
counterweight will not run into the shelf or pulley when the float is at a low stage or
strike the bottom of the float well when the float is at the highest stage. Float and
counterweight should pass each other and should have adequate clearance from the
sides of the Borehole.