1.  Do not lift or move a transformer without proper 

equipment and properly trained personnel.  Ensure that 

the transformer is only lifted using the listing provisions 

provided.  Always use lifting provisions provided by the 

manufacturer.  Rolling and skidding are recommended only 

on transformers with a pre-ordered skidding base.

2.  Do not off-load the transformer until it has been fully 

inspected for damages.  If any damages are identified the 

transformer should not be energized and the transformer 

manufacturer should be contacted immediately.

3.  Only use terminals for electrical connections. The 

transformer terminals are not designed to support the 

weight of line or load cable. 

4.  Connections should only be made in accordance with 

the nameplate diagram or connection drawings and the 

applicable local codes and standards.

5.  Make sure all power (including back-fed control and 

possible capacitor charge) is disconnected and all windings 

are grounded before attempting any work on the 

transformer or inside the enclosure. (zero energy)

6.  Make certain all ground connections, line terminals and 

selected tap connections are completed and tightened 

before energizing the transformer.

7.  Do not attempt to change any primary or secondary 

connections or taps while the transformer is energized.

8.  Do not tamper with control panels, alarms, interlocks, or 

control circuits if provided.

9.  Do not adjust or remove any accessories or cover plates 

while the transformer is energized.

10.  No cables should come in contact with or any live parts 

except the terminal that it is intended for.  Ensure that 

minimum clearances are maintained at all times.  

11.  This equipment must only be installed and serviced by 

qualified electrical personnel.

12.  Follow all requirements in NFPA 70E and CSA Z462 for safe 

work practice and personal protective equipment (PPE).

13.  Replace all devices, doors, and covers before turning on 

power to this equipment.

14.  Modifications of any kind to the equipment are not 

permitted. Besides voiding the warranty such actions 

may result in hazardous situations of which the person(s) 

performing the modifications will be solely liable. 

Safety Precautions

DANGER

SAFETY INSTRUCTIONS

HAZARD OF ELECTRIC SHOCK, EXPLOSION OR 
ARC FLASH

Refer to nameplate for ratings and voltages.
This equipment must only be installed and serviced by 
qualified electrical personnel.
Follow all requirements in NFPA 70E and CSA Z462 for 
safe work practice and personal protective equipment 
(PPE).
Turn off all power supplying this equipment before 
working on or inside equipment.
Always use a properly rated voltage sensing device to 
confirm power is off.
Replace all devices, doors, and covers before turning 
on power to this equipment.

Failure to follow these instructions will result in 
serious injury or death.

Class 1, Division 2,  

Hazardous Location

Installation Requirements

If this unit is designed for use in Class 1, Division 

2, Groups A, B, C & D hazardous locations then 

also refer to notes below:

(1)   Power, input and output (I/O) wiring must be in 

accordance with Class 1, Division 2 wiring methods 

as per Article 501-10 (b) of the National Electrical 

Code.

(2)  WARNING - EXPLOSION HAZARD - DO NOT DIS-

CONNECT EQUIPMENT WHILE  THE CIRCUIT IS 

LIVE OR UNLESS THE AREA IS KNOWN TO BE 

FREE OF IGNITABLE CONCENTRATIONS.

(3)  WARNING - EXPLOSION HAZARD - SUBSTITUTION 

OF ANY COMPONENT MAY IMPAIR SUITABILITY 

FOR CLASS I, DIVISION 2.

Please check resin level before drilling hole for conduit and site 
conduit properly so it does not come in contact with resin.

Summary of Contents for Titan N Series

Page 1: ...ctions 3 General 4 Handling 4 Receiving Inspection 4 Storage 5 Installation 5 Ventilation 6 Accessibility 6 Transformer Sound Levels 6 Cable Connections 7 Grounding 8 Altering the Transformer 8 Before...

Page 2: ...or property damage CAUTION Important Note Electrical equipment should be installed operated serviced and maintained only by qualified personnel No responsibility is assumed by the manufacturer for an...

Page 3: ...uipment must only be installed and serviced by qualified electrical personnel 12 Follow all requirements in NFPA 70E and CSA Z462 for safe work practice and personal protective equipment PPE 13 Replac...

Page 4: ...ting and other rough handling that may damage the transformer Ensure the transformers are transported in upright position avoid tilting and tipping Immediately after receiving the transformer it shoul...

Page 5: ...its free of condensation and any other contaminants resulting from the storage process it is safe to be energized Indoor Outdoor Transformers with Type 4 4X or 12 Enclosures All three phase encapsulat...

Page 6: ...ances Transformers are an electrically energized apparatus and by their nature during normal operation will emit a certain level of sound Transformers are required to meet NEMA standards for the maxim...

Page 7: ...and electrical joint compounds are recommended for use on all electrical connections Make certain to insulate any unused wire leads with marrette connectors and electrical tapes where applicable Refer...

Page 8: ...or property damage Any modifications to this equipment need to be compliant with all applicable codes and standards and certain modifications may jeopardize Warranty terms It is the responsibility of...

Page 9: ...dryness before energization This can be done by performing an insulation resistance test Megger Test If any exposure to moisture is suspected consult factory Under full load operating conditions enca...

Page 10: ...lled in harsh environmental conditions for ex outside environments with high levels of pollutants and dust etc Internal maintenance must be performed only with the transformer de energized isolated an...

Page 11: ...ansformers DANGER HAZARD OF ELECTRIC SHOCK EXPLOSION OR ARC FLASH Failure to follow the attached dry out procedures before energizing transformers previously exposed to moisture will result in serious...

Page 12: ...nd when condensation may be present When breather drain is mounted at the bottom of enclosure this unique design provides effective drainage of moisture due to condensation from within enclosure witho...

Page 13: ...3 61 2 89 6 16 7 14 4 7 22 5 77 9 25 0 21 7 10 8 8 66 15 41 6 36 1 18 0 14 4 30 83 3 72 2 36 1 28 9 45 125 108 54 1 43 3 75 208 180 90 2 72 2 100 278 241 120 96 2 112 5 312 271 135 108 150 416 361 180...

Page 14: ...S TYPE 4 ENCLOSURES Recommended cable entry location both sides Optional cable entry location Optional cable entry location Recommended cable entry location both sides Wall mounting hole locations Flo...

Page 15: ...WASHER BELLEVILLE WASHER FLAT WASHER TAP JUMPER LUG EYE LOOP OR LUG BOLT HEAD BOLT HEAD FLAT WASHER BELLEVILLE WASHER FLAT WASHER TAP JUMPER LUG DRAWING 1 Single Conductor Eyeloop Tap Lugs DOU TAP JU...

Page 16: ...rotection against falling rain sleet and external ice formation 4 All encapsulated transformers should be located away from any wall or any other obstruction please refer to the nameplate for the mini...

Page 17: ...fabricant ou de son repr sentant Remarque Ce guide contient des explications en trois langues anglais fran ais espagnol N de document DIM16 Date de parution Octobre 2017 Les images utilis es dans ce...

Page 18: ...et codes locaux relatifs ce type de travail et doivent tre v rifi es dans ce contexte Les m thodes recommand es dans ce guide concernent des applications g n rales Toute utilisation particuli re doit...

Page 19: ...t tre install et r par que par du personnel qualifi 12 Respectez toutes les exigences des normes NFPA 70E et CSA Z462 en mati re de pratiques de travail s curitaire et quipement de protection individu...

Page 20: ...d tecteur de tension lectrique correctement calibr pour vous assurer que le courant est coup Remettez en place tous les appareils les portes et les couvercles avant de mettre cet quipement sous tensio...

Page 21: ...afin de maintenir une temp rature uniforme sup rieure la temp rature ambiante et d viter la condensation Dans des cas extr mes ils peuvent tre entrepos s des temp ratures de 40 C 40 F ou plus Un soin...

Page 22: ...e install s dans des locaux renfermant des objets entrepos s risquant de faire obstacle la circulation de l air et aux inspections Les passages et les endroits dans lesquels des personnes risquent d t...

Page 23: ...des transformateurs Les bornes doivent tre nettoy es et il est recommand d utiliser de la p te joints pour application lectrique sur tous les branchements Veillez bien isoler les fils inutilis s avec...

Page 24: ...fonctionnement le transformateur doit tre correctement mis la terre avant d tre mis sous tension Un emplacement principal de mise la terre est identifi pour la plupart des transformateurs Si l emplac...

Page 25: ...n Cela peut tre fait en effectuant un test d induction de r sistance test avec un m gohmm tre Si vous suspectez une exposition l humidit consultez l usine Fonctionnement DANGER RISQUE DE CHOC LECTRIQU...

Page 26: ...hors tension des bornes avant d effectuer des travaux sur le transformateur entra nera des blessures graves voire mortelles Ins rer des objets dans les ouvertures de ventilation lorsque le transforma...

Page 27: ...5 pi lb N m 5 LAITON ALLIAGE CU270 pi lb N m 5 ACIER INOX B8 OU B8M pi lb N m 5 1 4 20 7 10 3 8 5 5 6 3 8 16 20 27 14 18 15 20 1 2 13 60 70 33 45 37 50 8 mm 20 23 12 14 12 14 12 mm 60 70 33 45 37 50 R...

Page 28: ...on de condensation Lorsque le bouchon de mise l air libre est install sous bo tier cette conception unique permet d vacuer de fa on efficace l humidit cr e par la condensation de l int rieur du bo tie...

Page 29: ...22 3 61 2 89 6 16 7 14 4 7 22 5 77 9 25 0 21 7 10 8 8 66 15 41 6 36 1 18 0 14 4 30 83 3 72 2 36 1 28 9 45 125 108 54 1 43 3 75 208 180 90 2 72 2 100 278 241 120 96 2 112 5 312 271 135 108 150 416 361...

Page 30: ...and pour passage du c ble deux c t s Emplacement facultatif pour passage du c ble Emplacement facultatif pour passage du c ble Emplacement recommand pour passage du c ble deux c t s Emplacement des tr...

Page 31: ...LLE RESSORT RONDELLE PLATE PRISE DE CAVALIER ANNEAU OU PRISE T TE DE BOULON T TE DE BOULON RONDELLE PLATE RONDELLE RESSORT RONDELLE PLATE PRISE DE CAVALIER SCH MA 1 Prises d anneau de conducteur simpl...

Page 32: ...neige et la formation de glace l ext rieur de l unit 4 Les transformateurs encapsul s doivent tre loign s des murs et de toutes autres obstructions consultez la plaque signal tique pour le d gagement...

Page 33: ...er referenciados al fabricante o a su representante Nota esta gu a es triling e ingl s franc s espa ol Literatura n DIM16 Fecha de emisi n Octubre de 2017 Las im genes utilizadas en esta gu a solo son...

Page 34: ...s abreviadas deben utilizarse en conjunto con todas las normas y los c digos locales que cubren dicho trabajo y deben ser referenciados en consecuencia Estas pr cticas recomendadas son para aplicacion...

Page 35: ...rsonal de equipos el ctricos calificado 12 Siga todos los requisitos de la norma NFPA 70E y CSA Z462 sobre la pr ctica de trabajo seguro y el equipo de protecci n personal PPE 13 Coloque todos los dis...

Page 36: ...ague el suministro de alimentaci n de este equipo antes de realizar cualquier trabajo en o dentro del equipo Utilice siempre un dispositivo de detecci n de tensi n adecuado para confirmar que la alime...

Page 37: ...dentro del transformador para mantener una temperatura uniforme superior a la temperatura ambiente y para evitar la condensaci n En casos extremos estos pueden almacenarse a temperaturas de no menos...

Page 38: ...rmadores no deben estar ubicados en reas donde sea probable que los objetos almacenados interfieran con la convecci n de aire natural o con la capacidad de inspeccionarlos Tambi n deben evitarse las v...

Page 39: ...s Las terminales deben limpiarse y se recomienda utilizar compuestos para las juntas el ctricas en todas las conexiones el ctricas Aseg rese de aislar todos los cables conductores con conectores Marre...

Page 40: ...onamiento seguro el transformador debe estar correctamente puesto a tierra antes de que sea conectado La mayor a de los transformadores tienen una ubicaci n a tierra principal identificada como corres...

Page 41: ...eba Megger Si se sospecha que hubo exposici n a la humedad consulte con la f brica Funcionamiento PELIGRO PELIGRO DE DESCARGA EL CTRICA EXPLOSI N O ARCO EL CTRICO Si el transformador no se opera de ma...

Page 42: ...de realizar cualquier trabajo en el transformador se producir n lesiones personales graves o la muerte Si inserta cualquier objeto a trav s de las aberturas de ventilaci n mientras el transformador e...

Page 43: ...S CON PERNOS TAMA O DEL PERNO ACERO CARBONO GRADO 5 pies libras Nm 5 BRONCE ALEACI N CU270 pies libras Nm 5 ACERO INOXIDABLE B8 O B8M pies libras Nm 5 1 4 20 7 10 3 8 5 5 6 3 8 16 20 27 14 18 15 20 1...

Page 44: ...arte inferior de la carcasa este dise o nico permite el drenaje efectivo de la humedad que se forma debido a la condensaci n desde el interior de la carcasa sin comprometer la integridad de la carcasa...

Page 45: ...9 6 16 7 14 4 7 22 5 77 9 25 0 21 7 10 8 8 66 15 41 6 36 1 18 0 14 4 30 83 3 72 2 36 1 28 9 45 125 108 54 1 43 3 75 208 180 90 2 72 2 100 278 241 120 96 2 112 5 312 271 135 108 150 416 361 180 144 AP...

Page 46: ...l cable recomendada ambos lados Ubicaci n de entrada del cable opcional Ubicaci n de entrada del cable opcional Ubicaci n de entrada del cable recomendada ambos lados Ubicaciones de los orificios de m...

Page 47: ...BELLEVILLE ARANDELA PLANA TERMINAL DEL PUENTE OJO O DERIVADO CABEZA DEL TORNILLO CABEZA DEL TORNILLO ARANDELA PLANA ARANDELA BELLEVILLE ARANDELA PLANA TERMINAL DEL PUENTE DIBUJO 1 Paneles de toma con...

Page 48: ...elo 4 Todos los transformadores encapsulados deben estar ubicados lejos de cualquier pared u otra obstrucci n consulte la placa para conocer la distancia m nima AP NDICE D Ubicaciones de entrada del c...

Reviews: