9.
Remove the fan wall covers.
10. Remove all the existing single rotor fans and fan blanks.
11. Connect the signal and power cables for the 8LFF.
12. Install eight dual rotor fans included in this 4LFF to 8LFF upgrade option.
13. Install the air baffle included in this 4LFF to 8LFF upgrade option.
14. Install the inner drive cage.
16. Install the inner rack rails.
17. Install the server into the rack.
18. Connect all peripheral cables to the server.
19. Connect each power cord to the server.
20. Connect each power cord to the power source.
22. If removed, install the bezel.
The installation is complete.
Upgrading 8SFF to 16SFF
Prerequisites
Before you perform this procedure, make sure that you have a T-10 Torx screwdriver available.
Procedure
1.
If installed,
2.
3.
Remove all power:
74
Hardware options installation
Summary of Contents for ProLiant DL325 Gen10 Plus
Page 36: ...10 Remove the inner drive cage blank 11 Remove the fan wall covers 36 Operations...
Page 37: ...12 For SFF drive cage remove the cable covers 13 Remove the drive cage latches Operations 37...
Page 38: ...14 Remove the outer drive cage LFF SFF 38 Operations...
Page 52: ...52 Operations...
Page 67: ...3 Remove the drive blank LFF SFF 4 Prepare the drive LFF Hardware options installation 67...
Page 119: ...SFF Cable routing Front I O LFF Cabling 119...
Page 120: ...SFF Cable routing Serial port 120 Cabling...