8
Figure 7 Attaching a four-hole mounting bracket to the rear mounting position on an HPE
1950 24G 2SFP+ 2XGT PoE+(370W)
switch
Figure 8 Attaching a four-hole mounting bracket to the mid-mounting position on an HPE
1950 24G 2SFP+ 2XGT PoE+(370W)
switch
Rack-mounting the switch
This task requires two people. To mount the switch in the rack:
1.
Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded.
2.
Verify that the mounting brackets have been securely attached to the switch chassis.
3.
Install cage nuts in the mounting holes in the rack posts.
4.
One person holds the switch chassis and aligns the mounting brackets with the mounting holes
in the rack posts, and the other person attaches the mounting brackets with screws to the rack.
5.
Verify that the switch chassis is horizontal and secure.
Figure 9 Mounting an HPE 1950 24G 2SFP+ 2XGT PoE+(370W) switch by the front mounting
position