EL-MF877-00 Page 6
Template Revision C
Last revalidation date 09-May-2018
HPI instructions for this template are available at
Step17
Use PH1 to unscrew six screws to loosen PCBA
from bottom chassis.
Step18
Disconnect fan cable connector and LED cable
connector from PCBA.
Step19
Remove PCBA away from bottom chassis.
Step20
Heat the solder of the Electrolytic Capacitors of
greater than 2.5cm in diameter or height and Remove it
Step21
Remove the Mylar from bottom chassis by hand-
pulling.
Step22
Use
PH1 to unscrew four screws to loosen fan
from bottom chassis.