Removal and replacement procedures 42
8.
Remove the non-hot-plug drive backplane.
To replace the component, reverse the removal procedure.
Four-bay LFF hot-plug drive backplane
To remove the component:
1.
If installed, remove the security bezel ("
Remove the security bezel (optional)
" on page
29
).
2.
Power down the server (on page
30
).
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Extend or remove ("
Remove the server from the rack
" on page
33
) the server from the rack.
5.
Remove the access panel ("
Access panel
" on page
40
).
6.
Remove all hot-plug hard drives.
7.
Disconnect all cables connected to the drive backplane.
Summary of Contents for ProLiant DL120 Gen9
Page 5: ...Contents 5 Documentation feedback 117 Index 118 ...
Page 13: ...Customer self repair 13 ...
Page 14: ...Customer self repair 14 ...
Page 15: ...Customer self repair 15 ...
Page 26: ...Illustrated parts catalog 26 ...
Page 36: ...Removal and replacement procedures 36 o Secondary PCI riser cage o PCI blank ...
Page 116: ...Acronyms and abbreviations 116 UID unit identification USB universal serial bus ...