Hardware options installation 33
8.
Push the handle down into the closed position to fully seat the storage controller/NVMe pass-through
board.
9.
Install the access panel (on page
).
10.
Install the server blade (on page
11.
Power up the server blade (on page
Smart Storage Battery option
To install the component:
1.
Power down the server blade (on page
2.
Remove the server blade (on page
3.
Place the server blade on a flat, level work surface.
4.
Remove the access panel (on page
5.
If installed, remove the direct connect SATA cable ("
Remove the direct connect SATA cable
" on
6.
If installed, remove the internal USB drive. To locate the internal USB connector, see "System board
components (on page
)."
7.
Remove the right DIMM baffle ("
Summary of Contents for ProLiant BL460c Gen9