2-6
Installing the Switch 2224
Installation Procedures
In
sta
llin
g
th
e
Switc
h
2224
3. Verify the Switch Operates Correctly
After you have optionally installed a transceiver module, but before mounting
the switch in its network location, you should first check that it is working
properly by plugging it into a power source and verifying that it passes its self
test.
1.
Connect the power cord supplied with the switch to the power connector
on the back of the switch, and then into a nearby properly grounded
electrical outlet.
N o t e
The Switch 2224 does not have a power switch. It is powered on when the
power cord is connected to the switch and to a power source.
The switch automatically adjusts to any voltage between 100-127 volts and
200-240 volts and either 50 or 60 Hz. There are no voltage range settings
required.
If your installation requires a different power cord than the one supplied with
the switch, be sure to use a power cord displaying the mark of the safety
agency that defines the regulations for power cords in your country. The mark
is your assurance that the power cord can be used safely with the switch.
2.
Check the LEDs on the switch. The LED behavior is described on the next
page.
Connect power cord to
the power connector
Ice.book Page 6 Monday, January 11, 1999 5:23 PM
Summary of Contents for ProCurve 2224
Page 2: ......
Page 3: ...HP ProCurve Switch 2224 Installation Guide Ice book Page i Monday January 11 1999 5 23 PM ...
Page 14: ...Ice book Page 8 Monday January 11 1999 5 23 PM ...
Page 30: ...Ice book Page 16 Monday January 11 1999 5 23 PM ...
Page 44: ...Ice book Page 6 Monday January 11 1999 5 23 PM ...
Page 59: ......