2-7
Installing the Switch
Installation Procedures
2.
Check the LEDs on the switch. The LED behavior is described
below.
When the switch is powered on, it performs its diagnostic self
test. The self test takes approximately 8 seconds to complete.
Self Test LED Behavior:
During the self test:
•
The LEDs will go on for a couple of seconds during the phases
of the self test.
When the self test completes successfully:
•
The
Power
LED stays on.
•
In the default state, the
FDx
LED stays on and the
Spd
LED
stays off.
•
The port LEDs on the front of the switch go into their normal
operational mode.
–
If the ports are connected to active network devices the
Link LEDs should be on.
If the LED display is different than what is described above, the
self test has not completed correctly. Refer to chapter 4,
“Troubleshooting” for diagnostic help.
Port LEDs
Power LED
Summary of Contents for ProCurve 1700-8
Page 1: ...Installation and Getting Started Guide www procurve com ProCurve Switch 1700 8 ...
Page 2: ......
Page 3: ...ProCurve Switch 1700 8 Installation and Getting Started Guide ...
Page 20: ......
Page 24: ......
Page 30: ......
Page 43: ...B 11 Safety and EMC Regulatory Statements Safety Information Safety Information Japan ...
Page 44: ...B 12 Safety and EMC Regulatory Statements Safety Information Safety Information China ...
Page 61: ......