Installing the Switch
Installation Procedures
Installation Procedures
These steps summarize your switch installation. The rest of this chapter
provides details on these steps.
1.
Prepare the installation site (
page 2-5
).
Make sure the physical
environment into which you will be installing the switch is properly
prepared, including having the correct network cabling ready to connect
to the switch and having an appropriate location for the switch. See
page
2-3
for some installation precautions.
2.
Verify the switch passes self test (
page 2-6
).
Plug the switch into a
power source and observe that the LEDs on the switch’s front panel
indicate correct switch operation.
3.
Mount the switch (
page 2-8
).
The V1410-16, V1410-24, and V1410-24-2G
Switches can be mounted in a 19-inch telco rack, in an equipment cabinet,
on a wall, under a table, or on a horizontal surface. The switches can also
be mounted on a wall, under a table, or on a horizontal surface.
4.
Connect power to the switch (
page 2-14
).
Once the switch is mounted,
plug it into the main power source.
5.
Connect the network devices (
page 2-16
).
Using the appropriate
network cables, connect the network devices to the switch ports.
At this point, your switch is fully installed. See the rest of this chapter if you
need more detailed information on any of these installation steps.
Summary of Contents for J9661A
Page 2: ......
Page 3: ...HP V1410 Switch Series Installation and Getting Started Guide ...
Page 8: ...vi Contents ...
Page 34: ...2 20 Installing the Switch Sample Network Topologies ...
Page 50: ...B 2 EMC Regulatory Statements Regulatory Statements Japan VCCI Class A Korea Taiwan ...
Page 58: ...4 Index ...