b. Move the system interconnect post away from the server bay (callout 1).
c. Release the node signal cables from the triangular bracket (callout 2).
To replace the component, reverse the removal procedure.
Removing and replacing the energy pack
Prerequisites
Before you perform this procedure, make sure that you have a T-10 Torx screwdriver available.
Procedure
2. Remove all power:
Removal and replacement procedures
52