Standard Operation Procedure
Document No.
Connery Travolta 14” & 15” FA DIS ASS’Y SOP
Station :
Name
: Ver. :
Date
:
Step
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Vick Weng
NPSU-PPE
Auditor
:
C.S. Lee
For 14
”
1. Disassemble Smartcard/B FFC. (Fig.1)
2. Disassemble USB/B FPC.(Fig.2)
For 15
”
1. Disassemble Smartcard/B FFC . (Fig.3)
2. Disassemble USB/B FPC. (Fig.4)
29(1/1)
Disassemble FFC & FPC
For 15”
Fig.3
Fig.4
For 15”
For 14
”
0.1
2016/10/26
Fig.1
Fig.2
For 14
”