
Standard Operation Procedure
Document No.
Connery Travolta 14” & 15” FA DIS ASS’Y SOP
Station :
Name
: Ver. :
Date
:
Step
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Vick Weng
NPSU-PPE
Auditor
:
C.S. Lee
1. Slide the HDD mylar strap to the right. (Fig.1)
2. Loosen HDD BRKT screw* 4. (Fig.2/ Fig.3)
3. Take out the HDD.
Loosen HDD BRKT Screws
7(1/1)
Electric cross screwdriver (#1)
1
Fig.1
1
2
Fig.3
3
4
Fig.2
0.1
2016/10/26