Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No.
: Slice FA Disassembly SOP
Station
:
Operation name
: Ver. :
Date
:
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step
:
Issue Dept.
:
Auditor
: Stanley Chen
NPSU-PPE
1. Disassembly antenna plug *2 from WLAN
card(Fig.1)
2. Disassembly thermal sensor connector
from M/B . (Fig.2) . Pick up sensor module
from rubber (Fig.3) ,and put it in the box .
3. Disassembly finger print FFC connector
from M/B (Fig.4).
Disassembly antenna plug ,thermal sensor
9(1/1)
0.10
2016/6/29
图一
Thermal sensor
connector
图二
图三
Support Rubber
F/G CNTR
图四
Summary of Contents for Elite Slice
Page 3: ...MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL Slice auditor Stanley Chen ...
Page 18: ...MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL Slice Auditor Stanley Chen ...
Page 24: ...MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL Slice Auditor Stanley Chen ...