47
Index
A
air conditioning
system recommendations
,
27
air conditioning ducts
,
28
air distribution system
room space return air
,
27
Altitude
,
18
B
basic air conditioning equipment requirements
,
26
basic air distribution systems
,
27
C
circuit breaker
,
15
computer room safety
fire protection
,
19
cooling requirements
,
26
D
data communications cables
,
25
dimensions and weights
,
13
ducts, air conditioning
,
28
E
electrical and environmental guidelines
air distribution system
,
27
computer equipment grounds
,
23
computer room safety
fire protection
,
19
dust and pollution control
,
28
electrical conduit ground
,
22
grounding systems
,
22
lighting requirements
,
20
main building electrical ground
,
22
,
23
power distribution safety grounding
,
22
power panel grounds
,
22
power quality
,
20
sources of electrical disturbances
,
21
system installation guidelines
,
25
electrical specifications
,
15
environmental elements
,
26
acoustics
,
30
air conditioning equipment requirements
,
26
air conditioning recommendations
,
27
air distribution systems
,
27
computer room considerations
,
26
cooling requirements
,
26
dust and pollution control
,
28
electrostatic discharge
prevention
,
30
humidity level
,
28
static protection measures
,
30
F
facility characteristics
,
31
facility guidelines
characteristics
,
31
floor loading terms
,
31
floor-plan grid
,
34
operational space requirements
,
34
typical raised floor site
,
32
windows
,
33
fire protection
,
19
floor loading
raised floor
,
31
G
grounding systems
,
22
electrical conduit ground
,
22
H
Humidity
,
18
humidity level
,
28
K
Keystone system
environmental elements
,
26
power system protection
,
21
typical installation schedule
,
37
M
main building electrical ground
,
22
P
Power
,
15
,
16
power distribution hardware
,
21
power distribution safety grounding
,
22
power distribution system
distribution hardware
,
21
power quality
,
20
power system protection
,
21
R
raised floor
ground system, illustrated
,
24
S
sources of electrical disturbances
,
21
space requirements
,
34
delivery space requirements
,
34
system installation guidelines
,
25
data communications cables
,
25
wiring connections
,
25
T
Temperature
,
18
typical installation schedule
,
37
W
wiring
connections
,
25