SVC 2- 4
21. Connect the Carrier Gas Inlet, disconnected in step 9.
22. Install the liner and all other hardware (except the column) removed during step 5.
23. Restore the supply gas pressure.
24. Check for leaks at all of the newly mated fittings.
25. Ensure that the septum is properly installed, and in
good condition.
25. Turn off the supply gas.
26. Remove the cap/plug from the end of the inlet.
27. Install the column and associated hardware removed
in step 5.
28. Restore the supply gas pressure.
29. Install the left side panel and secure using two screws.
30. Install the injection port cover.
31. Restore power to the HP 5890 Series II.
SEPTUM NUT
ASSEMBLY
SEPTUM
WELDMENT
Artisan Scientific - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisan-scientific.com