2-8
Installing the Switch
Installation Procedure
The HP 1820 8-port switches also do not have a power switch. They are
powered on when the external AC/DC power adapter is connected to the
switch and the adapter power cord to a power source. The external AC/DC
power adapter automatically adjusts to any voltage between 100-240 volts and
either 50 or 60 Hz.
2.
Check the LEDs on the switch as described below.
When the switch is powered on, it performs its diagnostic self test. The
self test takes approximately 45 seconds to complete.
Self Test LED Behavior:
During the self test:
•
Initially, the
Power
,
Fault/Locator
, and all port LEDs turn on.
•
After several seconds, the
Power
and
Fault/Locator
LEDs remain on,
and the port LEDs turn off. Then each port
Link
LED is sequentially
turned on, then off.
Power and Fault/
Locator LEDs
Port Link/Act and
Speed LEDs
Port Link/Act and
Mode LEDs
Summary of Contents for 1820-24G-PoE Plus
Page 2: ......
Page 3: ...HP 1820 Switch Series Installation and Getting Started Guide ...
Page 14: ...1 8 Switch Overview Switch Features ...
Page 52: ...A 12 Specifications Twisted Pair Cable Connector Pin Outs ...
Page 54: ...B 2 EMC Regulatory Statements Regulatory Statements Japan VCCI Class A Korea Taiwan ...
Page 58: ...Index 4 ...