2.5
Fitting the neutralisation box (Option)
1.
Remove the neutralisation box from its packaging.
Remove the front and rear cover of the neutralisation
box. Empty the neutralisation granulate into the neut
-
ralisation box (Fig. 15) and distribute evenly.
neutralisation granulate
front
1
Fig. 15
2.
Remove front cover (2a, Fig. 16). Release lateral lo
-
cking bolt (2) (turn approx. ¼ turn to the left and pull
out as far as the stop). Lift the front cover straight
upwards and remove it towards the front.
2
2a
3
Fig. 16
3.
Remove base plate (3, Fig. 16). Lift base plate straight
upwards and remove.
4.
Fit rear cover (4, Fig. 17) of the neutralisation box.
5.
Fit jubilee clip (5) approx. 20mm from the upper end
of the hose and tighten slightly. The hose (5a) of the
connection eccentric (5b) must be aligned towards
the left.
5
4
5a
5b
Fig. 17
6.
Slide the neutralisation box (6, Fig. 18) into the boiler
until the hose of the siphon (1,Fig. 15) is directly be
-
neath the drain connection.
6
Fig. 18
7.
The hose of the siphon (5a, Fig. 17) can be easily
pushed onto the drain connection of the condensate
drip tray by lifting the neutralisation box (7, Fig. 19).
10
4 213 784 / 00
ASSEMBLY
Summary of Contents for 41-UltraOil 16
Page 35: ...35 4 213 784 00...