
COOLANT BOTTLE ASSEMBLY - P/N: 40442
Checking Operation of
Automatic Cutting
Fluid Inducer
Note: The automatic cutting fl uid inducer system works
on a gravity fl ow basis. Therefore, it is only effective
when the drill is mounted on a horizontal or slightly
inclined work surface.
1. With Magnetic Drill in operation position, turn feed
handle so that the cutter and pilot are above the work
surface.
2. Fill cutting fl uid bottle with cutting fl uid.
3. To test automatic cutting fl uid inducer (with the magnet
ON and motor OFF), feed the arbor gently toward the
work surface until the pilot is pushed up into the cutter.
Open the needle valve until fl uid is visible fi lling the
plastic tube. Fluid should fi lter down onto the work
surface through the groove in the pilot.
4. To insure proper cutter lubrication, always make sure
that the slot in the pilot is kept clean from residual
buildup.
1. With magnetic drill in operating position, turn feed
handle so that cutter and pilot are above the work
surface.
2. With magnet turned ON and Motor OFF, fi ll reservoir by
introducing cutting fl uid through slots in Arbor. Cutting
fl uid should not leak out.
3. Test metering capabilities of Arbor/Cutter/ Pilot
assembly (magnet ON-motor OFF) by feeding the
Arbor gently toward work surface until pilot is pushed
up into Cutter, thus allowing fl uid to fi lter down onto
work surface through groove in pilot.
4. For proper lubrication, all cutting fl uid in reservoir
should empty onto work surface in no less than 15
seconds and no more than 30 seconds.
9
Checking Operation of
Cutting Fluid Arbor
Reservoir (10914S)
See Parts List on Page 15