![Hoshizaki KM-900MAH Service Manual Download Page 61](http://html1.mh-extra.com/html/hoshizaki/km-900mah/km-900mah_service-manual_2164742061.webp)
61
8. REMOVAL AND REPLACEMENT OF WATER REGULATING VALVE -
WATER-COOLED MODEL ONLY
IMPORTANT
Always install a new Drier every time the sealed refrigeration system is
opened. Do not replace the Drier until after all other repair or replacement
has been made.
1) Turn off the power supply.
2) Close the Water Supply Line Shut-off Valve.
3) Remove the panels.
4) Recover the refrigerant and store it in an approved container.
5) Disconnect the Capillary Tube at the Condenser outlet using brazing equipment.
6) Disconnect the Flare-connections of the valve.
7) Remove the screws and the valve from the Bracket.
8) Install the new valve, and braze the Capillary Tube.
9) Install the new Drier.
10) Check for leaks using nitrogen gas (140 PSIG) and soap bubbles.
11) Evacuate the system, and charge it with refrigerant. See the Nameplate for the
required refrigerant charge.
12) Connect the Flare-connections.
13) Open the Water Supply Line Shut-off Valve.
14) Check for water leaks.
15) Replace the panels in their correct positions.
16) Turn on the power supply.
Summary of Contents for KM-900MAH
Page 1: ...6 59 0 18 668 7 2 2 5 2 2 3 4 5 2 5HOLDELOLW LV D EHDXWLIXO WKLQJ70 5 9 6 180 5 73105...
Page 10: ...10 5 CONDENSING UNIT URC 12F...
Page 13: ...13 b KM 900MWH Models with Thermostat Models with Mechanical Bin Control...
Page 14: ...14 c KM 900MRH Models with Thermostat Models with Mechanical Bin Control...
Page 15: ...15 d KM 900MRH3 Models with Thermostat Models with Mechanical Bin Control...
Page 30: ...30 III TECHNICAL INFORMATION 1 WATER CIRCUIT AND REFRIGERANT CIRCUIT a KM 900MAH...
Page 31: ...31 b KM 900MWH...
Page 32: ...32 c KM 900MRH and KM 900MRH3...
Page 41: ...41 3 TIMING CHART...
Page 42: ...42...