![Hoshizaki KM-301BAJ Service Manual Download Page 13](http://html.mh-extra.com/html/hoshizaki/km-301baj/km-301baj_service-manual_2164624013.webp)
13
2. Shutdown Flow Chart
Shutdo
wn Flo
w Char
t
1.
Bin F
ull
Shutdo
wn Dela
y:
•
Fill Cy
cle
–1
5 sec.
af
ter activ
ation.
•
Har
vest Cy
cle
–1
5
sec.
af
ter
the
ne
xt
fr
eez
e c
ycle st
ar
ts
.
•
Fr
eez
e Cy
cle
–1
5
sec.
af
ter activ
ation
if activ
at
ed at least
1
5 sec.
bef
or
e the 5-min.
shor
t c
ycle pr
ot
ection
timer t
er
minat
es
.
Otherwise
, at the end of the
ne
xt har
vest c
ycle
.
Shutdo
wn
and R
estar
t
BC Oper
ation
BC
open
(BC actuat
or paddle eng
aged)
R
ed "PO
WER OK" LED fl
ashing
BC
closed
R
ed "PO
WER OK"
LED fl
ashing
.
FS
opens or
5-min.
timer t
er
minat
es
DV
de-ener
giz
es
PM
de-ener
giz
es
3.
Icemak
er Of
f
Minim
um of
f time:
90-sec.
minim
um
90-sec.
of
f timer t
er
minat
es
bef
or
e the appliance can
r
est
ar
t.
4.
Ice Le
vel Lo
w
er
ed
Icemak
er st
ar
ts at
"1
. 1
-Min
ut
e F
ill C
ycle
."
BC
closed
(BC actuat
or paddle diseng
aged)
R
ed "PO
WER OK" LED on solid
To
1.
1
-Min
ut
e F
ill Cy
cle
Leg
end:
BC–
bin contr
ol
DV
–dr
ain v
al
ve
FS
–fl
oat s
witch
PM
–pump mot
or
2.
W
at
er T
ank
Dr
ain
2 sec.
af
ter all components
de-ener
giz
e, D
V and
PM
ener
giz
e
for
a
max.
of 5 min.
or until
the FS opens
.
BC
closed
R
ed "PO
WER OK" LED fl
ashing
All components de-ener
giz
ed
D
V
-ener
giz
ed af
ter 2 sec.
PM-ener
giz
ed af
ter 2 sec.
Summary of Contents for KM-301BAJ
Page 31: ...31 I Freeze Up Check List ...