16) To confirm bin control operation, press the bin control’s actuator paddle during the first
5 minutes of the freeze cycle. The compressor and fan motor (if applicable) should
de-energize within 15 seconds, then the drain valve should energize until the water
tank empties. After the water tank empties, the pump motor and drain valve should
de-energize.
17) Close the door.
20