10
II. Sequence of Operation and Service Diagnosis
A. Sequence of Operation Flow Chart
1. Operation Flow Chart
FS
chec
k
1 t
o 3-min.
har
vest timer
in
contr
ol (S4 dip s
witch
1 & 2)
Leg
end:
BC
–bin contr
ol
CB
–contr
ol boar
d
Comp
–compr
essor
FM
–f
an mot
or
FS
–fl
oat s
witch
HGV
–hot g
as v
al
ve
HPT
–har
vest pump time
L
LV
–liquid line v
al
ve
PM
–pump mot
or
WV
–inlet w
at
er v
al
ve
Components Ener
giz
ed when the Contr
ol S
witc
h is in the "W
A
SH" P
osition
The "W
A
SH" position on the contr
ol s
witch is used when cleaning and sanitizing the unit.
W
hen in the "W
A
SH" position, po
w
er is supplied
to the pump mot
or
. W
ith the cleaning v
al
ve closed, the cleaner and sanitiz
er fl
ow o
ver the outside of the e
vapor
at
or plat
e assemb
ly
. W
ith the
cleaning v
al
ve open, the cleaner and sanitiz
er fl
ow o
ver both the outside and the inside of the e
vapor
at
or plat
e assemb
ly
.
Not
e:
Close the cleaning v
al
ve af
ter cleaning and sanitizing ar
e complet
e, otherwise the unit will not r
est
ar
t when the contr
ol
switch is placed in the "ICE" position.
Oper
ation Flo
w Char
t
1.
1
-Min
ut
e
Fill Cy
cle
C
ycl
e
St
eps
2.
Har
vest Cy
cle
•
WV
time:
6 min.
or the length of har
vest min
us HPT
set
ting (S4 dip s
witch 6), whiche
ver is shor
ter
.
• Max.
har
vest time:
20 min.
Ther
mist
or
in contr
ol
3.
F
reez
e Cy
cle
• Min.
fr
eez
e time:
5 min.
• Max.
fr
eez
e time:
fr
eez
e timer set
ting (S4
dip s
witch 9 & 1
0).
FS
in contr
ol
4.
P
ump-Out Cy
cle
• F
act
or
y set f
or e
ver
y 1
0th
cy
cle
(S4 dip s
witch 5)
• P
ump mot
or st
ops f
or
2
sec., then r
ev
er
ses f
or
10/20 sec.
(S4 dip s
witch 3 & 4)
WV
ener
giz
ed
FS
open
Comp
ener
giz
ed
HGV
ener
giz
ed
WV
ener
giz
ed
Ther
mist
or t
emper
atur
e r
eaches
48
°F (9°C) (3.9
kΩ or less).
Har
vest
timer st
ar
ts
.
FS
open
Comp
ener
giz
ed
FM
ener
giz
ed
PM
ener
giz
ed
L
LV
ener
giz
ed
HGV
de-ener
giz
ed
FS
closed
Comp
ener
giz
ed
HGV
ener
giz
ed
PM
de-ener
giz
es f
or 2 sec.,
then r
ev
er
ses f
or 1
0/20 sec.
FM
de-ener
giz
ed
LL
V
de-ener
giz
ed
FS
chec
k
Star
tup
If
FS
is open, C
omp st
ops and c
ycle
retur
ns t
o 1
-Min.
fi
ll.
5-min.
minim
um
fr
eez
e timer in
contr
ol
FS
closed
FS
opens or fr
eez
e
timer t
er
minat
es
50 sec.
PM
ener
giz
ed
WV
de-ener
giz
ed
Har
vest P
ump
Time
Slush Contr
ol
Ther
mist
or t
emper
atur
e
reaches 36°F (2.2°C) (5.8 kΩ).
PM
de-ener
giz
ed f
or
10 sec.