22
Extendable Tongue:
When extra length is required on the tongue, the 5
position pullout may be extended up to a of maximum of
91.5 cm (3.0’).
• Remove the pullout stop hardware as shown in the
diagram.
• Extend the pullout to the desired length, then
replace the pullout stop hardware.
• Ensure the hardware is fastened securely.
•
The retractable, auto-lock feature will work in all
extended positions.
Pullout Stop
Pullout
2
Top Rail
Top Rail Mount
1
3
The top rail features adjustment in height and position. Position adjustments include 9 positions along the top rail
mount, and 6 top rail height settings.
Generally these will be a one time adjustments to match your combine. If another make or model combine is used then
adjustment may have to be made again.
Top Rail System
Top Rail Position Adjustment:
Adjusting the position of the top rail can be done safely with one person, by “walking” it to position up or down.
If your model has a centre support (bridge), remove the draw pin, and store in a unused hole position.
NOTE:
When removing or inserting
the top rail draw pins, you may have
to lift the top rail slightly to take the
weight off the draw pin for easy
removal.
•
1
At one end, remove the snap pin then carefully
pull the draw pin out only half way. This will allow
the top rail to pivot slightly without sliding.
•
At the opposite end, release the top rail by carefully
pulling out the draw pin. Set the draw pin close by.
•
2
Slide the rail in the direction of position you’ve
chosen, one hole at a time. You can slide the
rail a maximum of 2 hole positions but you may
experience some binding.
• Replace the draw pin half way.
•
3
Go back to the opposite end and remove
the draw pin and slide the top rail to the next hole
position.
• Replace the draw pin half way.
•
Follow the previous steps to “walk” the top rail to the
position you require.
•
When in the final position, fully insert the draw pins,
(including the centre) and secure them with the snap
pins.