![horsch Avatar SD 40 Quick Start Manual Download Page 8](http://html1.mh-extra.com/html/horsch/avatar-sd-40/avatar-sd-40_quick-start-manual_2164069008.webp)
Avatar SD40
Folding
8
Folding
Pay attention to the sequence of the following steps!
• Connect the machine to the tractor.
• Connect all hoses,
including the case drain!
• Fold in the railing on the catwalk platform
.
• Switch on the E-Manager and select hydraulics
Lifting
in the display.
• Lift the machine until the symbols for unfolding/ folding change to black.
• Remove the aluminum clips from the support wheels.
• Switch on the hydraulic
Folding
function in the display.
• Fold the railing and confirm in E-Manager before the wings are folded. Risk
of damages!
Summary of Contents for Avatar SD 40
Page 1: ...1...
Page 2: ......
Page 12: ...Avatar SD40 Work screen 12...
Page 13: ...Avatar SD40 Work screen 13...
Page 14: ...Avatar SD40 Work screen 14...
Page 16: ...Avatar SD40 Meter calibration 16...
Page 20: ...20 Rotors Standard Crop...
Page 21: ...21 Rotors Standard Crop continued...
Page 22: ...22 Rotors Fertilizer...
Page 23: ...23 Rotors Small Seed...
Page 25: ...Blockage Monitoring System Advanced Air Drill Rate and Blockage System 25...
Page 29: ...Notes...