![horsch Avatar SD 40 Quick Start Manual Download Page 5](http://html1.mh-extra.com/html/horsch/avatar-sd-40/avatar-sd-40_quick-start-manual_2164069005.webp)
5
Machine Hook Up:
Avatar Hook-Up consists of the following connections:
1. Lift/Lower, Fold/Unfold
Hydraulic Hoses
2. SOD Fan
Hydraulic hoses
3. Case
Drain
Hose (single hose)
4. ISO Connector
5. Extra Power Connector
6. Road Lighting Connector
IMPORTANT! Always hook up Case Drain first, prior
to machine operation to avoid any issues!
6
5
2
1
3
4
For further information about machine operation, safety and technical specifications, see the model year specific Owner’s Manual
included with the machine, or view it electronically or download it at the official HORSCH web site located at
https://www.horsch.com/us/service/downloads/downloadcenter/us
Summary of Contents for Avatar SD 40
Page 1: ...1...
Page 2: ......
Page 12: ...Avatar SD40 Work screen 12...
Page 13: ...Avatar SD40 Work screen 13...
Page 14: ...Avatar SD40 Work screen 14...
Page 16: ...Avatar SD40 Meter calibration 16...
Page 20: ...20 Rotors Standard Crop...
Page 21: ...21 Rotors Standard Crop continued...
Page 22: ...22 Rotors Fertilizer...
Page 23: ...23 Rotors Small Seed...
Page 25: ...Blockage Monitoring System Advanced Air Drill Rate and Blockage System 25...
Page 29: ...Notes...