TECHNICAL SUPPORT

 

Tel: 317 916-4274     

 

 

Fax:: 317 639-4279   

Web:

http://www.hornerlighting.com

   

Email:

[email protected]

 

 

LMAN0073-01-EN

Hazardous Location Series

SERVICING

• To avoid personal injury, disconnect power to the light and allow the unit to cool down before 

     performing maintenance.

• Perform visual, electrical and mechanical inspec�ons on a regular basis. The environment and 

     frequency of use should determine this. However, it is recommended that checks should be made at 

     least once a year. 

• The external lens should be cleaned periodically to ensure con�nued luminaire performance. Clean the 

     glass with a clean damp, non-abrasive, lint-free cloth. If this is not sufficient, use a mild soap or a liquid 

      cleaner. DO NOT use an abrasive, strong alkaline or acid cleaner as damage may occur.

• Inspect the cooling fins on the luminaire to ensure that they are free of any contamina�on 

      (i.e. excessive dust build-up). Clean with a non-abrasive cloth if needed.

• Mechanically check to make sure all parts are properly assembled.

• Electrically check to make sure that all connec�ons are clean and �ght.

NPT Assembly Instruc�ons

 

Step 1. Inspect port and fi�ng to ensure that both are free of  

 

              contaminants and excessive burrs and nicks.

 

Step 2. Apply a stripe of an anaerobic liquid pipe sealant   

 

              around the male threads leaving the first two threads

 

              uncovered. If no liquid sealant is available, wrap Teflon  

 

              tape (width of 12.7mm and thickness of 0.1mm) 2.5- 3  

 

              turns in a clockwise direc�on, viewed from the pipe  

 

              end, leaving the rest two threads uncovered.

 

CAUTION: Teflon tape and some pipe sealants are destructive

  

 

to hydraulic components. Always use extreme caution and  

 

follow manufacturer’s recommendations for proper application  

 

of any sealant in order to prevent contamination.

 

Step 3. Screw finger �ght into the port

 

Step 4. Wrench �ghten the fi�ng to the correct Turns Past  

 

              Finger Tight posi�on. A properly assembled

 

              fi�ngs total thread engagement should be 3.5 to 6 turns.

               

CAUTION: Never back off an installed pipe fitting to achiev

e  

 

proper alignment. Loosening installed pipe fittings will corrupt  

 

the seal and contribute to leakage and failure.

 

(*Applicable standard: ASME B1.20.1-2013)

Step 1 & Step 2

Step 3

Step 4

Summary of Contents for ETG-HHR

Page 1: ...her wiring methods in accordance with Ar cle 502 in the Na onal Electrical Code NFPA 70 Turn off electrical power at fuse or circuit breaker box before wiring fixture to the power supply Turn off the power when you perform any maintenance Verify that supply voltage is correct by comparing it with the luminaire label informa on Make all electrical and grounded connec ons in accordance with the Na onal...

Page 2: ...o suitable conduit 3 Inset the wire from outside through the conduit and the entry hole of Tank then connect to Terminal Block 4 Introduce the wires of branch circuit as following Black wiring connects to Line White wiring connects to Neutral Green wiring connects to Ground 5 Re a ach the Tank Cover and ghten it by eight M6 hexagon bolts of Tank Cover with torque value 6 N m 6 Check the ghtness of...

Page 3: ...ket Step 1 Secure the bracket and hood with 4 M10 expansion bolts not provided directly to a structural member make sure the hinge is located as marked See Figure 1a Adjust the angle 6x15 of the bracket and fix the posi on with M5 screws provided Step 2 Hang the fixture onto the hinge hook of the hood Connect supply wires to luminaire wire leads or Wago connectors Step 3 Close driver housing making ...

Page 4: ...he M5 set screw Make sure the gasket of the adapter is properly inserted into the slot Step 2 Hang the hood onto the adapter align as marked Step 3 Rotate the hood clockwise and secure the adapter with M5 screws provided to 5 N m Step 4 Hang the fixture onto the hinge hook of the hood Connect supply wires to luminaire wire leads or Wago connectors Step 5 Close driver housing making sure that all wi...

Page 5: ...ot Step 3 Hang the hood onto the adapter align as marked Step 4 Rotate the hood clockwise and secure the adapter with M5 screws provided to 5 N m Step 5 Hang the fixture onto the hinge hook of the hood and Connect supply wires to luminaire wire leads or Wago connectors Step 6 Close driver housing making sure that all wires are safely inside driver Tighten three cap ve closing screw M6 to 6 N m Note...

Page 6: ...all parts are properly assembled Electrically check to make sure that all connec ons are clean and ght NPT Assembly Instruc ons Step 1 Inspect port and fi ng to ensure that both are free of contaminants and excessive burrs and nicks Step 2 Apply a stripe of an anaerobic liquid pipe sealant around the male threads leaving the first two threads uncovered If no liquid sealant is available wrap Teflon ta...

Reviews: