6. If leaks are found on the compression nuts, depressurize the unit and slightly tighten the leaking
compression nut.
7. Retest until a leak-free installation is verified.
8. Once UV unit is leak-free, the quartz sleeve installation is complete and the UV lamp can be installed.
Note: To remove tube from fitting, first remove the C-clamp then push fitting sleeve down.
Once the fitting sleeve is down, pull the tube out of the fitting.
Install Lamp
Perform this procedure only after the quartz sleeve installation and leak-tests are completed successfully
1. Connect the UV lamp to the 4-point receptacle. If the lamp is not installed properly, lamp breakage
will occur.
2. Insert lamp into quartz sleeve through compression nut pass-thru.
3. Install rubber boot over compression nut.
4. Connect unit power cable to power source.
5. Tighten the 4 screws to secure ballast box cover.
6. Turn ON the power to the unit.
7. Verify UV lamp operation from the viewport.
8. Allow one minute for the UV lamp to warm up prior to flowing water through the UV unit.
Caution: Use the viewport to verify the proper operation of the UV lamp.
Caution: Rapid successive cycling of the power to the ballast can cause premature failure
of the unit.
Caution: Prior to energizing the lamp, make sure there is no water leaking from the quartz
sleeve compression nuts.
Mounting the Unit
Once the UV unit is assembled and tested successfully, it can be mounted onto its permanent
operational location. The unit must be mounted in a manner that will prevent excessive vibration and
warping which will damage the quartz sleeve.
Operational Notes
• Release the pressure in the UV treatment chamber before breaking the compression nut seals.
• Disconnect all power to the UV unit before servicing.
• Do not allow the inlet water temperature to drop below 35ºF (2ºC).
• Do not allow the flow rate to exceed 2 GPM.
• Do not cycle the UV unit more than 3 "ON/OFF" cycles in a 24-hour period.
• Ensure all plumbing connections are tightly sealed before applying pressure.
• Before connecting the return tube, flush the unit to rinse out any debris left from the installation
process.
39
Installation
Summary of Contents for Seafari Escape 200
Page 2: ......
Page 6: ......
Page 10: ......
Page 28: ......
Page 73: ...3 8 1 9 2 7 5 4 3 6 Seafari Escape 200 600 74...
Page 75: ...2 5 7 6 3 4 8 1 6 4 8 3 Seafari Escape 200 600 76...
Page 77: ...8 4 1 5 3 7 3 2 6 9 4 10 11 Seafari Escape 200 600 78...
Page 89: ...7 8 6 4 1 3 1 2 4 9 5 Seafari Escape 200 600 90...
Page 91: ...9 3 6 7 8 10 4 1 1 4 5 5 2 Seafari Escape 200 600 92...
Page 93: ...13 3 10 11 14 12 8 4 6 7 9 5 1 7 9 2 Seafari Escape 200 600 94...
Page 95: ...10 18 9 6 15 5 8 16 17 7 14 3 1 20 2 4 11 13 Seafari Escape 200 600 96...
Page 103: ...5 6 2 3 2 6 7 9 9 8 1 10 5 Seafari Escape 200 600 104...
Page 113: ...12 8 9 2 10 13 1 3 5 4 14 11 6 15 7 Seafari Escape 200 600 114...
Page 116: ...1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 20 19 17 18 117 Exploded Parts View...
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......