2 PREPARATION
6
2
PREPARATION
The following preparations are required before operating the device. See Installation Manual
for installation, piping and wiring instructions.
Status of parts at delivery
pH sensor installation:
For measuring pH (optional)
Conductivity sensor installation: For measuring conductivity (optional)
Beads insertion:
For cleaning the residual-chlorine sensor
Parts
Status on Delivery
Mesh filter
Installation required
Zero water filter
Installation required
Residual-chlorine
sensor
Installed
Conductivity sensor
Installation required
pH sensor
Installation required
pH sensor
Conductivity sensor
(Optional)
(Optional)
Insert beads
Sample water feed valve
Mesh filter
must be closed.
Summary of Contents for TW-100
Page 1: ...Water Distribution Monitor TW 100 Instruction Manual CODE GZ0000080187H ...
Page 8: ......
Page 174: ......