Set Up
2
Set Up
Unpacking
Contains one set of transmitter and one drying agent.
Mounting the Field Transmitter
Prepare a 50 A pipe. Fix the transmitter firmly to the prepared pipe as shown in the figure. You
can mount it in both directions (right or left). An optional hood (FD-10) is available.