Commissioning
For putting Network Clock Device 8030HEPTA/NCD into operation the application need to be
supplied with voltage; then both modules 8030NTC and 8030NTS/M need to be configured.
For further information for putting the modules into operation please have a look at the indi-
vidual module-manuals.
6.1
Switching the Operating Voltage on
AC power supply:
I O
Put the mains power switch into position "
I
" (on).
The Network Clock Device 8030HEPTA/NCD starts running with
the boot process indicated in the display (see
Chapter 6.2 LCD-
Display after Switch On / Reset (Boot
Phase)
)
.
DC power supply:
Switch on external power supply source.
The Network Clock Device 8030HEPTA/NCD starts running with
the boot process indicated in the display (see
Chapter 6.2 LCD-
Display after Switch On / Reset (Boot
Phase)
).
6.2
LCD-Display after Switch On / Reset (Boot Phase)
In the 2x40digit LCD-Display the following start-up picture appears for the boot phase after
switching on or a reset:
h o p f 8 0 3 0 H E P T A / N T C : B o o t i n g . . .
S t a t u s - L E D s ( F r o n t ) : L E D - T e s t a c t i v e