User Manual of String Inverter
28
4.2 Power on the system
After ensuring that the electrical connection is completed normally, you can perform the
power-on operation and turn on the inverter.
Step 1:
Put the "DC SWITCH" of the inverter into the "ON" state.
Step 2:
Close the AC circuit breaker between the inverter and the power grid.
After performing the above steps, if there is no fault in the system and the start-up conditions
are met, the inverter will start up automatically.
4.3 Power off the system
Matters needing attention
After the inverter is powered off, there will be residual power and residual heat in the
chassis, which may cause electric shock or burns. Be sure to operate the inverter after
the inverter system has been powered off for 5 minutes.
When powering off the system, be sure to follow the operation instruction sequence and
safety regulations in this chapter.
Step 1:
Use the data collector or near-end APP software to issue a shutdown command to
shut down the inverter.
Step 2:
Open the circuit breaker between the inverter and the power grid.
Step 3:
Put the "DC SWITCH" of the inverter into the "OFF" state.
-- Chapter end --
Summary of Contents for hopeSun 10KTL
Page 1: ......
Page 25: ...3 System installation 23 Figure 3 9 Grounding of multiple string inverters...
Page 39: ......