![Hope Industrial Systems HIS-ML18B User Manual Download Page 10](http://html1.mh-extra.com/html/hope-industrial-systems/his-ml18b/his-ml18b_user-manual_2161817010.webp)
10
Installation into Panel
1.
Refer to the drawing below.
2.
Locate position in panel for mounting of the monitor. Assure that there
is adequate space begin the panel. Allow extra space (0.5 in. behind and
on each side) for air ventilation.
3.
Cut a rectangular hole in the panel. Clean and deburr.
Dimensions: 17.85” (454mm) W x 14.44” (367mm) H ; +/- .020”
4.
Separate the rear collar from the unit by removing the 12 nuts.
5.
Insert the unit into the front of the panel and re-attach the collar.
6.
Tighten all 12 nuts to a torque of 24 inch-pounds to assure a water-tight
seal between the poron bezel gasket on the monitor and equipment panel.
HIS will not assume liability for damage to internal electronics due to
improper installation.