background image

PRO DUNK® ASSEMBLY INSTRUCTIONS

 

 (~Day 5) 

 

7.  Loosen the top four 16mm J-Bolt Hex Nuts (L) from the 16mm Anchor J-

Bolts (K).  Leave Anchor Footing Template (N) in place. 

8.  Put the 16mm Anchor J-bolt Washers (Z) on each Anchor J-Bolt (K). 
9.  Place the Vertical Post (A) down over the footing making sure not to 

damage the 16mm Anchor J-Bolts (K) threads. Using the 16mm J-Bolt 
Gusseted Hex Nuts With Built-In Washer (BB), bolt down Vertical Post (A) 
finger tight with two metal ears on the Vertical Post (A) to the rear. 

10. Level the Vertical Post (A) by adjusting the 16mm J-Bolt Hex Nuts (L) 

located underneath the flanged base plate of the Vertical Post (A). Then 
tighten top 16mm J-Bolt Gusseted Hex Nuts With Built-In Washer (BB) 
against the top side of the flanged base plate of the Vertical Post (A).  

11. Slide the Main Extension Arm (B) over the top of the Vertical Post (A) and 

attach to the lower pivot tube with a 18mm X 33cm Hex Bolt (P) and a 
18mm Lock Nut (Q). 

12. Next attach the Crank Adjustment Cylinder (F) using an 18mm X 33cm 

Hex Bolt (P) at the top and 16mm X 15cm Hex Bolt (H) at the bottom. 
Tighten each with a 18mm Lock Nut (Q) and 16mm Lock Nut (J). 

13. Line up the hole located in the Rim Height Indicator (G) which is plastic 

with a hole in one end over the hole in one of the second set of welded 
tubes in the Main Extension Arm (B). Attach both Spring-Assist Cartridges 
(E) to the Main Extension Arm (B) using an 20mm X 33cm Hex Bolt (X) 
and 20mm Lock Nut (Y).  In order to attach both Spring-Assist Cartridges 
(E) at the bottom, lower the open end of each Spring-Assist Cartridge (E) 
down over the top of each welded tab as shown in 

Figure A

. Use the 

16mm X 19cm Hex Bolt (I) and 16mm Lock Nut (J) to attach them to the 
welded tabs. You may need to turn or rotate the Spring-Assist Cartridges 
(E) to line up holes. The Rim Height Indicator (G) should hang freely along 
the outside of one of the Spring-Assist Cartridges (E). Next, remove and 
discard the blue plastic spreader tube from Spring-Assist Cartridge (E).  

14. Attach Parallel Linkages (C) to Vertical Post (A) with a 18mm X 30cm Hex 

Bolt (O) and a 18mm Lock Nut (Q).  

 

NOTE: It does not matter which end of the 
parallel link you attach to the vertical post. 

 
 

CAUTION: Injury may occur if linkages are 
allowed to fall off main arm during assembly. 

 
 
 

15. [THIS STEP HAS ALREADY BEEN DONE DURING PREASSEMBLY] 

Next, lay the H-Frame Backboard Mount (D) down into backboard aligning 
the four top and bottom holes in the H-Frame Backboard Mount (D) with 
the four holes in the top and bottom of the backboard. Check to make sure 

 

6

Summary of Contents for PD-P-G

Page 1: ...not wear jewelry rings watches necklaces etc Objects may entangle in net Pro Dunk Platinum Basketball System MODEL NUMBER PD P G WELCOME TO THE FAMILY OF PRO DUNK OWNERS Thank you for purchasing our basketball system We try hard to ensure that our products are of high quality and free of manufacturing defects and of missing parts However if you have any problems with your basketball pole such as a...

Page 2: ...uts K 4 16mm Anchor J Bolts L 8 16mm J Bolt Hex Nuts M 4 Anchor Footing Rebars N 1 Anchor Footing Template O 2 18mm X 30cm Hex Bolts P 3 18mm X 33cm Hex Bolts Q 6 18mm Lock Nuts R 8 10mm X 3cm Hex Bolts S 8 10mm Flatwashers T 8 10mm Lockwashers U 8 10mm Hex Nuts V 1 Rim Height Sticker W 4 Plastic and Steel Spacers X 1 20mm X 33cm Hex Bolts Y 1 20mm Lock Nuts Z 4 16mm Anchor J bolt Washers AA 1 Bla...

Page 3: ... components and cross check against bill of materials Report any shortages to Hoops Inc customer service at 1 800 294 4667 3 Assembly is a two part process PART 1 PART 2 Day 1 Complete Anchor System Installation Instructions Below Day 5 Complete Pro Dunk assembly instructions Day 2 Allow concrete to cure Day 3 Allow concrete to cure Day 4 Allow concrete to cure 4 For safety measures have at least ...

Page 4: ...of the way on to each 16mm Anchor J Bolt K Place the threaded end of each 16mm Anchor J Bolt K through the 4 holes located in the Anchor Footing Template N Then thread a second 16mm J Bolt Hex Nut L on to each 16mm Anchor J Bolt K until tight against the Anchor Footing Template N making sure to keep the 16mm Anchor J Bolt K hooks pointing in toward the center of the Anchor Footing Template N 4 For...

Page 5: ...re the concrete fills in around the 16mm Anchor J Bolts K hooks Make sure the Anchor Footing Template N is pressed firmly against the top of the wet concrete Use the level to ensure that it is level in all directions Additionally the center line of the 16mm Anchor J Bolts K must be parallel with the edge of the playing surface See figure C NOTE The four 16mm J Bolt Hex Nuts L on the bottom of the ...

Page 6: ...he Rim Height Indicator G which is plastic with a hole in one end over the hole in one of the second set of welded tubes in the Main Extension Arm B Attach both Spring Assist Cartridges E to the Main Extension Arm B using an 20mm X 33cm Hex Bolt X and 20mm Lock Nut Y In order to attach both Spring Assist Cartridges E at the bottom lower the open end of each Spring Assist Cartridge E down over the ...

Page 7: ...cers W Insert them into four rim holes in the backboard This is very important to prevent backboard breakage CAUTION Do not proceed with rim installation without these spacers 19 Mount the rim to the H Frame Backboard Mount D and Backboard assembly using the hardware supplied in the rim box NOTE Use a level to make sure rim is level side to side before tightening nuts 20 After everything is square...

Page 8: ...you d like to restrict height adjustment from 10 to 7 you can optionally insert the Black Safety Rod And Pin AA into the tube on the back of the Vertical Post A NOTE It is advisable to do so to avoid injury 8 ...

Page 9: ...Installation Figures 9 ...

Page 10: ...10 ...

Page 11: ...h a 100 Cotton soft cloth lukewarm water and mild soap Do not scrub Rinse backboard with lukewarm water again Dry with 100 cotton soft cloth To minimize scratches and minor abrasions to your backboard Rim The goal should not be cranked under 5 6 or over 10 Adjustments of the goal should be done under adult supervision When attempting slam dunk activity you should always wear a mouth guard to avoid...

Page 12: ...merchandise prior to authorization of warranty claims What is not covered by this warranty This warranty does not cover defects or damage due to improper installation shipping handling alteration accidents vandalism weather conditions rusting exposure to corrosives negligence misuse anything other than a type of basketball activity or related contact with the unit scratching scuffing or any event ...

Reviews: