
than too dry.
6. Insert the broomstick in 3 or 4 different places and vibrate up and down to
settle the concrete. Submerge the (4) anchor footing rebar pieces into the
center of the hole spaced evenly. Next set the anchor bolt assembly into
the wet concrete, vibrate it as it goes in to make sure the concrete fills in
around the J-Bolt hooks. Make sure the template is pressed firmly against
the top of the wet concrete. Use the level to ensure that it is level in all
directions. Additionally, the center line of the J-Bolts must be parallel with
the edge of the playing surface. (See
figure C
)
STOP HERE!
Allow footing to cure for 3-7 days before proceeding.
5