
Installation Instructions
In order to have the safest fun and longest use of your Pro Dunk® system,
please note and heed the following:
1. Prior to main post preparation and goal assembly, call utility services for
location of underground utility lines before you dig.
2. NOTE: Immediately unpack all components and cross check against bill of
materials. Report any shortages to Hoops customer service at
1.800.294.4667.
3. Vertical main post assembly is a two part process.
PART 1
PART 2
Day 1.
Complete Anchor System
Installation Instructions. (Below)
Day 5.
Complete Pro Dunk®
assembly instructions.
Day 2.
Allow concrete to cure.
Day 3
Allow concrete to cure.
Day 4.
Allow concrete to cure.
4. For safety measures have at least 3 capable persons to assist you in
assembly of your Pro Dunk® Goal.
3